Thursday, March 6

Back Home

Last week, I blogged about the work in our house here. Oops, that was 2 weeks ago already! The one room I omitted was the bathroom. The bathroom is a WONDERFUL place. It, too, is not finished, but it is coming along as Bob has time.

When we arrived back from leave, we found that the tile was up, the toilet installed, and the plumbing working more or less. What was not finished was: there was no seat on the toilet; no toilet paper holder nor towel bars; no shelves; the sink slopes backwards so that the water stands in the soap dish spot; the shower head leaked, spraying water all over the untiled part of the wall; and the hot water tap didn't always work (maybe because it is crooked). Oh, I forgot. The toilet did not flush.

Several things were fixed in short order. Bob is now painting the top part of the room (over the tiles) with oil-based paint. This in itself is interesting as I am allergic to such things. So he paints with several fans on full blast, blowing the fumes out of the window. I avoid the area and take antihistamines. This allergy is the primary reason that some other things have been awaiting paint for years. Regardless of the challenges, the bathroom is beautiful:




Isn't that the coolest shower head? It is like standing out in the rain. If you look closely, you can see that the hot water tap (on the left) is crooked. Perhaps that is why it does not work well.

This bathroom will be the nicest room in our house. I confess to feeling a bit guilty about it. Though we have payed for the tile and some of the fixtures ourselves, it seems pretty indulgent.
Posted by Picasa

No comments: